Home About
Services All Services Kitchen RenovationsBathroom RenovationsBasement Development & SuitesHome AdditionsWhole Home RenovationsCustom Homes & New BuildsFlooring & Interior FinishingExterior RenovationsCommercial & Tenant ImprovementsDesign-Build & Project Management
Service Areas All Areas SurreyLangleyBurnabyCoquitlamRichmondDeltaWhite RockNew WestminsterVancouverNorth VancouverWest VancouverPort CoquitlamPort MoodyMaple RidgePitt MeadowsAbbotsford
Projects FAQ Contact Get a Free Estimate Call (778) 846-1965
Kitchen with oak island, cream cabinetry, and pendant lighting
Signature Service

Kitchen Renovations in the Lower Mainland

Custom cabinetry, stone surfaces, structural openings, and the trades coordination that keeps a kitchen build on schedule.

Licensed & InsuredWorkSafeBC CoveredMetro Vancouver & Fraser ValleyWritten Fixed QuotesOne Accountable TeamWarrantied Workmanship

A kitchen renovation is the most trade-dense project in a house. Cabinetry, counters, plumbing, electrical, ventilation, flooring, drywall, and tile all have to land in the right sequence, and a single missed dimension at the cabinet stage can push the whole schedule out by weeks. We plan kitchens backward from the install dates so every trade arrives to a space that is genuinely ready for them.

New Level Projects Solutions handles kitchen renovations from the first measured drawing through to the final adjustment on the cabinet doors. You get one contract, one project manager, and one team that is accountable for the finished room rather than a chain of subcontractors pointing at each other.

What a New Level Kitchen Build Covers

Most of our kitchen projects involve more than a cosmetic refresh. Removing a wall between a galley kitchen and a dining room changes the load path, which means an engineered beam, a permit, and an inspection. Moving a sink to an island means a new drain line through the floor system and a properly vented connection. Relocating a range means a dedicated circuit and a new exterior vent penetration. We scope all of it up front so there are no mid-project surprises about what the work actually requires.

We also handle the parts of a kitchen that nobody photographs and everybody notices later: adequate lighting layers, receptacle placement that matches how you actually cook, soft-close hardware that is properly adjusted, and a ventilation system sized for the appliance you bought rather than the one the builder assumed.

Cabinetry and Surfaces

We work with local cabinet shops and established suppliers across the Lower Mainland, which means we can scope anything from a quality stock program on a tight budget to fully custom millwork with integrated appliance panels and specialty inserts. Whatever the tier, the cabinets are measured on site after demolition, not from a floor plan, because framing is rarely as square as the drawing suggests.

For counters we template after the boxes are set and levelled. Quartz, granite, porcelain slab, and solid surface are all available, and we walk you through the practical trade-offs on seam placement, edge profile, and waterfall ends before the slab is cut.

Quote: Kitchen Renovations

Send us the details and we will get back to you within one business day.

We reply to every request within one business day. No obligation, no pressure.

White kitchen with island opening to the dining area
Scope

What This Service Covers


  • Full kitchen gut and rebuild
  • Custom and semi-custom cabinetry
  • Quartz, granite, and porcelain counters
  • Load-bearing wall removal with engineered beams
  • Kitchen and dining room open concept conversions
  • Plumbing relocation and rough-in
  • Dedicated appliance circuits and panel upgrades
  • Recessed, under-cabinet, and feature lighting
  • Range hood venting to exterior
  • Backsplash and feature tile
  • Flooring transitions and underlayment
  • Island and peninsula construction
How It Works

Our Process on Every Project


The same five stages whether the job is a powder room or a custom home.

Consultation and Site Visit

We walk the property with you, listen to what you want, and give you a realistic read on scope, budget range, and timeline before anyone commits to anything.

Detailed Quote and Scope

You get an itemized written estimate with allowances stated at realistic numbers, not placeholders designed to look good and blow out later.

Design, Engineering, and Permits

We coordinate drawings, structural engineering where required, and the full permit application with your municipality, and we manage inspections through to sign-off.

Construction and Weekly Updates

One project manager, one schedule, and a written update every week covering progress, what is next, and any decisions we need from you.

Walkthrough, Deficiencies, and Handover

We walk the finished project with you and build a deficiency list. Everything on it is corrected before final payment, and you receive a full warranty and specification package.

Answers

Kitchen Renovations Questions


The questions clients ask most about kitchen renovations.

How long does a full kitchen renovation take?

A straightforward kitchen replacement with no structural or plumbing changes typically runs four to six weeks on site. Once you add wall removal, plumbing relocation, or fully custom cabinetry, plan on eight to twelve weeks from demolition to final walkthrough.

The single biggest schedule driver is cabinet lead time, which can run six to ten weeks on its own. We order cabinets as early as the design allows so fabrication happens in parallel with permitting and demolition rather than after it.

Do I need a permit to renovate my kitchen in the Lower Mainland?

If you are replacing cabinets, counters, flooring, and finishes in the same layout, most municipalities do not require a building permit. The moment you remove or alter a load-bearing wall, relocate plumbing fixtures, or add circuits, a permit is generally required.

Requirements differ between Vancouver, Surrey, Burnaby, and the other Lower Mainland municipalities, and strata buildings add their own approval process on top. We confirm the requirements with your specific authority before work begins and handle the application on your behalf.

Can I stay in my home during the kitchen renovation?

Most clients do. We set up dust containment at the work area, protect the flooring on the path in and out, and can help you rig a temporary kitchen with a fridge, microwave, and sink elsewhere in the house.

The loudest phases are demolition and any concrete or structural work, which are usually confined to the first week. If you have a newborn, work from home on calls, or have a family member with health sensitivities, tell us early and we will sequence the noisy work into a block you can plan around.

What does a kitchen renovation cost in Metro Vancouver?

Pricing depends far more on scope than on square footage. A quality cosmetic refresh using stock cabinetry in the existing layout generally starts in the mid five figures. A full gut with custom millwork, stone surfaces, a structural opening, and relocated services typically lands in the six figure range.

We do not quote from a photo. After a site visit and a conversation about how you use the space, you get an itemized estimate that separates construction, cabinetry, surfaces, appliances, and allowances so you can see exactly where the money goes and adjust before we start.

Do you supply the appliances, or do I?

Either works. Many clients prefer to buy their own appliances to take advantage of seasonal pricing, and we are happy to work that way as long as we have the specification sheets early.

What matters is that we know the exact models before cabinetry is ordered, because panel-ready fridges, slide-in ranges, and integrated dishwashers all have different rough opening and clearance requirements. A late appliance change after cabinets are built is one of the most expensive avoidable mistakes in a kitchen project.

Do you provide a warranty on kitchen work?

Yes. Our workmanship is warrantied, and manufacturer warranties on cabinetry, counters, fixtures, and appliances pass through to you with the documentation collected in one package at handover.

We also do a follow-up visit after the first season of use to adjust cabinet doors and drawers, which naturally settle as the house moves through its first heating cycle.

Coverage

Kitchen Renovations Across the Lower Mainland


We deliver this service throughout Metro Vancouver and the Fraser Valley. Select your city for local detail on permits, housing stock, and site conditions.

Next Step

Ready to Talk About Your Kitchen Renovations Project?


Book a free site visit and get an itemized written estimate with no obligation.

Call Now Free Estimate